Monday I called the heating oil company and closed our oil delivery account. Monday was the same day that our geo thermal heating/ cooling system was started up.
Geo thermal is simple – water is drawn from a well, piped through a heat exchanger, and returned to the aquifer through a return well.
I recognize that I still drive a car and use oil in other ways, but at least I can eliminate up to a thousand gallons of oil per year from our footprint. The next step will be a wind turbine to supply us with electricity, but that’s still a few years off, and will require a bit of research and planning. All in all, we are patiently taking a more sustainable direction in our lives, and it feels good…and it feels right.
|
Well boring rig in place for main well |
|
|
|
|
| |
Well supply truck |
|
|
|
|
Main well finished and capped |
|
Return well and piping trench |
|
|
Running the electric wires |
|
|
Prepping the submersible pump for installation |
| |
The heat exchanger during installation |
|
Finished! |
No comments:
Post a Comment